A single Bubbler Sky unit needs a concrete slab of about 7.8 m × 2.8 m and stands about 4 m tall. Day to day, much of the work is automatic: it rinses its own membranes and is remotely monitored, with regular service visits, membrane cleaning and lab tests.

How much space does it need?

For one unit, plan for:

  • A concrete slab of about 7.8 m × 2.8 m for a single unit, buffer tank included. A buried buffer may need a smaller slab, confirmed at the site visit.
  • Height of about 4 m.
  • Pre-treatment before the plant: a screen and a fat trap.
  • A buffer tank that holds about 24 hours of flow.
  • Sludge handling: a drying bed on site, or collection by a licensed tanker.
  • A 2 bar drinking-water point for the membrane backwash.
  • A dedicated single-phase power supply.

How much sewage can one unit treat?

Each unit treats domestic sewage at up to 10 kL (10 000 L) a day. More units can be combined on a larger slab when a site needs more capacity. A façade can be fitted around a single unit so it blends in. We check the fit at the site visit.

Maintenance

What the upkeep looks like:

  • Automatic backwash. The unit rinses its hollow-fibre membranes with clean tap water every 30 minutes, without anyone on site.
  • Membrane cleaning. Every so often the membranes get a deeper clean, done by a trained person.
  • Remote monitoring. The unit reports its status remotely and sends alarms to the operator if something needs attention.
  • Service visits. Regular visits check the pre-treatment, pumps and membranes.
  • Lab tests. The treated water is lab-tested regularly.
  • Sludge. Excess sludge goes to a drying bed on site, or is collected by a licensed tanker and taken to an approved site.
  • Membranes. Membranes wear over time and are replaced when needed.
  • Pre-treatment upkeep. The screen and fat trap need regular cleaning by the site team.
  • Site checks. Quick checks by the site team: warning lights, leaks and float switches (daily and weekly).

Designed to meet the DWS General Limits under normal operation, with proper pre-treatment and operation. We help the property owner apply for the approvals needed.

Bubbler Sky is installed at Clouds Estate and La Cabriere.

Using the treated water

The treated water is for irrigation, not for drinking, cooking, bathing or swimming. Irrigating with treated water must be registered with the Department of Water and Sanitation before it starts, and on a municipal sewer connection the municipality must approve it too. A site close to a river or wetland may need a full water use licence. We’ll check this with you at the site visit.